Stop run
/runs/{id}/stopStop a run early. Works for every run type. Already-finished runs are left untouched; the response is the run either way.
Path parameters
idstringrequiredThe run id (run_...)
Responses
200The run after the stop
idstringrequiredThe run id (run_...)
typestringrequiredWhat kind of run this is
statusstringrequiredCompletion estimate. Cell-based runs (enrichment, quick_search) also report cell counts; dataset fills report row counts; builds on a dataset report what landed.
Attributes
percent_completenumbernullableestimated_seconds_remainingnumbernullableelapsed_secondsnumbernullablecompleted_cellsintegerCell-based runs only
total_cells_expectedintegerCell-based runs only
not_found_cellsintegernullableCell-based runs only. Null while a run over 5,000 rows is in progress; set when it finishes.
total_rowsintegerDataset fills only. Rows in the fill's scope
completed_rowsintegerDataset fills only. Rows finished (ok, not found, or failed)
running_rowsintegerDataset fills only. Rows an agent is working on right now
requested_rowsintegerBuilds on a dataset only. The count asked for
generated_rowsintegerBuilds on a dataset only. Rows the generator found; set when the run finishes
added_rowsintegerBuilds on a dataset only. Rows that landed in the dataset; set when the run finishes
skipped_duplicate_rowsintegerBuilds on a dataset only. Generated rows dropped as duplicates on the index column; set when the run finishes
credits_usednumberCredits consumed so far
The estimate made at kickoff next to what has been charged so far. estimate is null for runs
started before estimates existed. Estimates and credit errors add credits_remaining and sufficient_credits.
Attributes
estimateone ofrequiredAttributes
CreditEstimate model →
minimumnumberrequiredLeast the run can cost
expectednumberLikely cost from past runs of the same config; absent without history
typicalobjectRecent p25–p75 settled range for builds of this size; absent without a dataset build estimate
Attributes
lownumberrequiredhighnumberrequiredmaximumnumberrequiredMost the run can cost
upfrontnumberCredits taken at kickoff when charged_upfront is true; 0 when the charge accrues as work completes
charged_upfrontbooleanrequiredtrue when a deposit is taken at kickoff (dataset builds, extractions); false when credits accrue as work completes
- null
credits_usednumberrequiredCredits charged so far (same value as the top-level credits_used)
credits_remainingnumberAccount balance. Only on estimates and credit errors.
sufficient_creditsbooleanWhether the balance covers estimate.maximum. Only on estimates and credit errors.
app_urlstring uriLink to view this run in the Riveter app
result_urlstring urirequiredWhere to fetch the run's output
started_atstring date-timenullablefinished_atstring date-timenullableerrorobjectnullableNull unless the run hit an error
Attributes
typestringmessagestringstopped_reasonStoppedReasonWhy the run has status stopped. Only present on stopped runs.
user_request: stopped through the API or the app. credit_limit: the account ran out of credits.
error: the run failed (internal error, or every enrichment cell failed); error.message has the detail.
enrichment_idstringPresent when the run belongs to an enrichment
enrichment_namestringdataset_idstringPresent on dataset-build runs
extraction_idstringPresent on extraction runs
monitor_idstringPresent on monitor-scheduled runs
webhook_urlstring uriPresent when the run has a webhook configured
401Missing or invalid API key (request_status body — see the AuthError schema)
request_statusstringmessagestringerror_typestring403The API key's account may not access this resource or endpoint (forbidden), or the account has not migrated to Datasets yet (feature_not_enabled — open Datasets in the app and click "Migrate to Datasets")
errorobjectrequiredAttributes
typestringrequiredMachine-readable error type (bad_request, not_found, forbidden, feature_not_enabled, duplicate_run_key, insufficient_credits, credit_cap_exceeded, validation, not_implemented, ...)
messagestringrequiredHuman-readable explanation
detailsanyOptional extra context (e.g. per-field validation errors)
credit_detailCreditDetailThe estimate made at kickoff next to what has been charged so far. estimate is null for runs
started before estimates existed. Estimates and credit errors add credits_remaining and sufficient_credits.
Attributes
estimateone ofrequiredAttributes
CreditEstimate model →
minimumnumberrequiredLeast the run can cost
expectednumberLikely cost from past runs of the same config; absent without history
typicalobjectRecent p25–p75 settled range for builds of this size; absent without a dataset build estimate
Attributes
lownumberrequiredhighnumberrequiredmaximumnumberrequiredMost the run can cost
upfrontnumberCredits taken at kickoff when charged_upfront is true; 0 when the charge accrues as work completes
charged_upfrontbooleanrequiredtrue when a deposit is taken at kickoff (dataset builds, extractions); false when credits accrue as work completes
- null
credits_usednumberrequiredCredits charged so far (same value as the top-level credits_used)
credits_remainingnumberAccount balance. Only on estimates and credit errors.
sufficient_creditsbooleanWhether the balance covers estimate.maximum. Only on estimates and credit errors.
404No resource with that id on this account
errorobjectrequiredAttributes
typestringrequiredMachine-readable error type (bad_request, not_found, forbidden, feature_not_enabled, duplicate_run_key, insufficient_credits, credit_cap_exceeded, validation, not_implemented, ...)
messagestringrequiredHuman-readable explanation
detailsanyOptional extra context (e.g. per-field validation errors)
credit_detailCreditDetailThe estimate made at kickoff next to what has been charged so far. estimate is null for runs
started before estimates existed. Estimates and credit errors add credits_remaining and sufficient_credits.
Attributes
estimateone ofrequiredAttributes
CreditEstimate model →
minimumnumberrequiredLeast the run can cost
expectednumberLikely cost from past runs of the same config; absent without history
typicalobjectRecent p25–p75 settled range for builds of this size; absent without a dataset build estimate
Attributes
lownumberrequiredhighnumberrequiredmaximumnumberrequiredMost the run can cost
upfrontnumberCredits taken at kickoff when charged_upfront is true; 0 when the charge accrues as work completes
charged_upfrontbooleanrequiredtrue when a deposit is taken at kickoff (dataset builds, extractions); false when credits accrue as work completes
- null
credits_usednumberrequiredCredits charged so far (same value as the top-level credits_used)
credits_remainingnumberAccount balance. Only on estimates and credit errors.
sufficient_creditsbooleanWhether the balance covers estimate.maximum. Only on estimates and credit errors.
422The request is valid but can't be executed (e.g. insufficient_credits, credit_cap_exceeded when max_credits is set, validation failure)
errorobjectrequiredAttributes
typestringrequiredMachine-readable error type (bad_request, not_found, forbidden, feature_not_enabled, duplicate_run_key, insufficient_credits, credit_cap_exceeded, validation, not_implemented, ...)
messagestringrequiredHuman-readable explanation
detailsanyOptional extra context (e.g. per-field validation errors)
credit_detailCreditDetailThe estimate made at kickoff next to what has been charged so far. estimate is null for runs
started before estimates existed. Estimates and credit errors add credits_remaining and sufficient_credits.
Attributes
estimateone ofrequiredAttributes
CreditEstimate model →
minimumnumberrequiredLeast the run can cost
expectednumberLikely cost from past runs of the same config; absent without history
typicalobjectRecent p25–p75 settled range for builds of this size; absent without a dataset build estimate
Attributes
lownumberrequiredhighnumberrequiredmaximumnumberrequiredMost the run can cost
upfrontnumberCredits taken at kickoff when charged_upfront is true; 0 when the charge accrues as work completes
charged_upfrontbooleanrequiredtrue when a deposit is taken at kickoff (dataset builds, extractions); false when credits accrue as work completes
- null
credits_usednumberrequiredCredits charged so far (same value as the top-level credits_used)
credits_remainingnumberAccount balance. Only on estimates and credit errors.
sufficient_creditsbooleanWhether the balance covers estimate.maximum. Only on estimates and credit errors.