API
Dataset CRUD

Delete rows

DELETE/datasets/{id}/rows

Remove up to 100 rows by id (ids, comma-separated row_...) and / or by position (positions, comma-separated integers from 1). Positions of the other rows do not change. Unknown ids or positions are a 422; nothing is deleted then.

Path parameters

idstringrequired

The dataset id (ds_...)

Query parameters

idsstring

Comma-separated row ids (row_...). ids and positions together name up to 100 rows; one of them is required

positionsstring

Comma-separated row positions (integers from 1, as GET rows reports them)

Responses

200Rows deleted
deletedinteger
row_countinteger
400The request is malformed or names a conflicting parameter combination
errorobjectrequired
Attributes
typestringrequired

Machine-readable error type (bad_request, not_found, forbidden, feature_not_enabled, duplicate_run_key, insufficient_credits, credit_cap_exceeded, validation, not_implemented, ...)

messagestringrequired

Human-readable explanation

detailsany

Optional extra context (e.g. per-field validation errors)

credit_detailCreditDetail

The estimate made at kickoff next to what has been charged so far. estimate is null for runs started before estimates existed. Estimates and credit errors add credits_remaining and sufficient_credits.

Attributes
estimateone ofrequired
Attributes
One of
  • CreditEstimate model →
    minimumnumberrequired

    Least the run can cost

    expectednumber

    Likely cost from past runs of the same config; absent without history

    typicalobject

    Recent p25–p75 settled range for builds of this size; absent without a dataset build estimate

    Attributes
    lownumberrequired
    highnumberrequired
    maximumnumberrequired

    Most the run can cost

    upfrontnumber

    Credits taken at kickoff when charged_upfront is true; 0 when the charge accrues as work completes

    charged_upfrontbooleanrequired

    true when a deposit is taken at kickoff (dataset builds, extractions); false when credits accrue as work completes

  • null
credits_usednumberrequired

Credits charged so far (same value as the top-level credits_used)

credits_remainingnumber

Account balance. Only on estimates and credit errors.

sufficient_creditsboolean

Whether the balance covers estimate.maximum. Only on estimates and credit errors.

401Missing or invalid API key (request_status body — see the AuthError schema)
request_statusstring
One of error
messagestring
error_typestring
One of unauthorized
403The API key's account may not access this resource or endpoint (forbidden), or the account has not migrated to Datasets yet (feature_not_enabled — open Datasets in the app and click "Migrate to Datasets")
errorobjectrequired
Attributes
typestringrequired

Machine-readable error type (bad_request, not_found, forbidden, feature_not_enabled, duplicate_run_key, insufficient_credits, credit_cap_exceeded, validation, not_implemented, ...)

messagestringrequired

Human-readable explanation

detailsany

Optional extra context (e.g. per-field validation errors)

credit_detailCreditDetail

The estimate made at kickoff next to what has been charged so far. estimate is null for runs started before estimates existed. Estimates and credit errors add credits_remaining and sufficient_credits.

Attributes
estimateone ofrequired
Attributes
One of
  • CreditEstimate model →
    minimumnumberrequired

    Least the run can cost

    expectednumber

    Likely cost from past runs of the same config; absent without history

    typicalobject

    Recent p25–p75 settled range for builds of this size; absent without a dataset build estimate

    Attributes
    lownumberrequired
    highnumberrequired
    maximumnumberrequired

    Most the run can cost

    upfrontnumber

    Credits taken at kickoff when charged_upfront is true; 0 when the charge accrues as work completes

    charged_upfrontbooleanrequired

    true when a deposit is taken at kickoff (dataset builds, extractions); false when credits accrue as work completes

  • null
credits_usednumberrequired

Credits charged so far (same value as the top-level credits_used)

credits_remainingnumber

Account balance. Only on estimates and credit errors.

sufficient_creditsboolean

Whether the balance covers estimate.maximum. Only on estimates and credit errors.

404No resource with that id on this account
errorobjectrequired
Attributes
typestringrequired

Machine-readable error type (bad_request, not_found, forbidden, feature_not_enabled, duplicate_run_key, insufficient_credits, credit_cap_exceeded, validation, not_implemented, ...)

messagestringrequired

Human-readable explanation

detailsany

Optional extra context (e.g. per-field validation errors)

credit_detailCreditDetail

The estimate made at kickoff next to what has been charged so far. estimate is null for runs started before estimates existed. Estimates and credit errors add credits_remaining and sufficient_credits.

Attributes
estimateone ofrequired
Attributes
One of
  • CreditEstimate model →
    minimumnumberrequired

    Least the run can cost

    expectednumber

    Likely cost from past runs of the same config; absent without history

    typicalobject

    Recent p25–p75 settled range for builds of this size; absent without a dataset build estimate

    Attributes
    lownumberrequired
    highnumberrequired
    maximumnumberrequired

    Most the run can cost

    upfrontnumber

    Credits taken at kickoff when charged_upfront is true; 0 when the charge accrues as work completes

    charged_upfrontbooleanrequired

    true when a deposit is taken at kickoff (dataset builds, extractions); false when credits accrue as work completes

  • null
credits_usednumberrequired

Credits charged so far (same value as the top-level credits_used)

credits_remainingnumber

Account balance. Only on estimates and credit errors.

sufficient_creditsboolean

Whether the balance covers estimate.maximum. Only on estimates and credit errors.

422The request is valid but can't be executed (e.g. insufficient_credits, credit_cap_exceeded when max_credits is set, validation failure)
errorobjectrequired
Attributes
typestringrequired

Machine-readable error type (bad_request, not_found, forbidden, feature_not_enabled, duplicate_run_key, insufficient_credits, credit_cap_exceeded, validation, not_implemented, ...)

messagestringrequired

Human-readable explanation

detailsany

Optional extra context (e.g. per-field validation errors)

credit_detailCreditDetail

The estimate made at kickoff next to what has been charged so far. estimate is null for runs started before estimates existed. Estimates and credit errors add credits_remaining and sufficient_credits.

Attributes
estimateone ofrequired
Attributes
One of
  • CreditEstimate model →
    minimumnumberrequired

    Least the run can cost

    expectednumber

    Likely cost from past runs of the same config; absent without history

    typicalobject

    Recent p25–p75 settled range for builds of this size; absent without a dataset build estimate

    Attributes
    lownumberrequired
    highnumberrequired
    maximumnumberrequired

    Most the run can cost

    upfrontnumber

    Credits taken at kickoff when charged_upfront is true; 0 when the charge accrues as work completes

    charged_upfrontbooleanrequired

    true when a deposit is taken at kickoff (dataset builds, extractions); false when credits accrue as work completes

  • null
credits_usednumberrequired

Credits charged so far (same value as the top-level credits_used)

credits_remainingnumber

Account balance. Only on estimates and credit errors.

sufficient_creditsboolean

Whether the balance covers estimate.maximum. Only on estimates and credit errors.