Convert output column to input
/datasets/{id}/columns/promoteTurn an output column into an input column of the same name. Every row's value moves with it, so later columns and dedupe can key on it. Refused with 409 dataset_in_use while a fill runs. Converting the last output column leaves the dataset with none; a fill is refused until one is added.
Path parameters
idstringrequiredThe dataset id (ds_...)
Request bodyrequired
columnstringrequiredThe output column name
Responses
200The dataset after the conversion
idstringds_...
namestringnullableinput_columnsarray of stringInput column names, in order (row identity)
index_columnstringnullableThe input column rows are unique on
enrichment_idstringnullableThe bound enrichment (its output columns are the dataset's)
output_columnsarray of stringOutput column names, in order (from the bound enrichment; [] without one). Prompts and schemas are on GET /enrichments/{enrichment_id}
row_countintegerrows_expiredbooleanTrue once the rows were removed by retention; the structure stays
import_in_progressbooleanA CSV import accepted with 202 has not landed yet
runsarray of DatasetRunSummaryThe five newest runs on the dataset
Attributes
idstringrun_...
typestringdataset_build = list generation; enrichment = a fill
statusstringcreated_atstring date-timefinished_atstring date-timenullablecreated_atstring date-timeupdated_atstring date-time400The request is malformed or names a conflicting parameter combination
errorobjectrequiredAttributes
typestringrequiredMachine-readable error type (bad_request, not_found, forbidden, feature_not_enabled, duplicate_run_key, insufficient_credits, credit_cap_exceeded, validation, not_implemented, ...)
messagestringrequiredHuman-readable explanation
detailsanyOptional extra context (e.g. per-field validation errors)
credit_detailCreditDetailThe estimate made at kickoff next to what has been charged so far. estimate is null for runs
started before estimates existed. Estimates and credit errors add credits_remaining and sufficient_credits.
Attributes
estimateone ofrequiredAttributes
CreditEstimate model →
minimumnumberrequiredLeast the run can cost
expectednumberLikely cost from past runs of the same config; absent without history
typicalobjectRecent p25–p75 settled range for builds of this size; absent without a dataset build estimate
Attributes
lownumberrequiredhighnumberrequiredmaximumnumberrequiredMost the run can cost
upfrontnumberCredits taken at kickoff when charged_upfront is true; 0 when the charge accrues as work completes
charged_upfrontbooleanrequiredtrue when a deposit is taken at kickoff (dataset builds, extractions); false when credits accrue as work completes
- null
credits_usednumberrequiredCredits charged so far (same value as the top-level credits_used)
credits_remainingnumberAccount balance. Only on estimates and credit errors.
sufficient_creditsbooleanWhether the balance covers estimate.maximum. Only on estimates and credit errors.
401Missing or invalid API key (request_status body — see the AuthError schema)
request_statusstringmessagestringerror_typestring403The API key's account may not access this resource or endpoint (forbidden), or the account has not migrated to Datasets yet (feature_not_enabled — open Datasets in the app and click "Migrate to Datasets")
errorobjectrequiredAttributes
typestringrequiredMachine-readable error type (bad_request, not_found, forbidden, feature_not_enabled, duplicate_run_key, insufficient_credits, credit_cap_exceeded, validation, not_implemented, ...)
messagestringrequiredHuman-readable explanation
detailsanyOptional extra context (e.g. per-field validation errors)
credit_detailCreditDetailThe estimate made at kickoff next to what has been charged so far. estimate is null for runs
started before estimates existed. Estimates and credit errors add credits_remaining and sufficient_credits.
Attributes
estimateone ofrequiredAttributes
CreditEstimate model →
minimumnumberrequiredLeast the run can cost
expectednumberLikely cost from past runs of the same config; absent without history
typicalobjectRecent p25–p75 settled range for builds of this size; absent without a dataset build estimate
Attributes
lownumberrequiredhighnumberrequiredmaximumnumberrequiredMost the run can cost
upfrontnumberCredits taken at kickoff when charged_upfront is true; 0 when the charge accrues as work completes
charged_upfrontbooleanrequiredtrue when a deposit is taken at kickoff (dataset builds, extractions); false when credits accrue as work completes
- null
credits_usednumberrequiredCredits charged so far (same value as the top-level credits_used)
credits_remainingnumberAccount balance. Only on estimates and credit errors.
sufficient_creditsbooleanWhether the balance covers estimate.maximum. Only on estimates and credit errors.
404No resource with that id on this account
errorobjectrequiredAttributes
typestringrequiredMachine-readable error type (bad_request, not_found, forbidden, feature_not_enabled, duplicate_run_key, insufficient_credits, credit_cap_exceeded, validation, not_implemented, ...)
messagestringrequiredHuman-readable explanation
detailsanyOptional extra context (e.g. per-field validation errors)
credit_detailCreditDetailThe estimate made at kickoff next to what has been charged so far. estimate is null for runs
started before estimates existed. Estimates and credit errors add credits_remaining and sufficient_credits.
Attributes
estimateone ofrequiredAttributes
CreditEstimate model →
minimumnumberrequiredLeast the run can cost
expectednumberLikely cost from past runs of the same config; absent without history
typicalobjectRecent p25–p75 settled range for builds of this size; absent without a dataset build estimate
Attributes
lownumberrequiredhighnumberrequiredmaximumnumberrequiredMost the run can cost
upfrontnumberCredits taken at kickoff when charged_upfront is true; 0 when the charge accrues as work completes
charged_upfrontbooleanrequiredtrue when a deposit is taken at kickoff (dataset builds, extractions); false when credits accrue as work completes
- null
credits_usednumberrequiredCredits charged so far (same value as the top-level credits_used)
credits_remainingnumberAccount balance. Only on estimates and credit errors.
sufficient_creditsbooleanWhether the balance covers estimate.maximum. Only on estimates and credit errors.
409Duplicate run_key or a run already in progress
errorobjectrequiredAttributes
typestringrequiredMachine-readable error type (bad_request, not_found, forbidden, feature_not_enabled, duplicate_run_key, insufficient_credits, credit_cap_exceeded, validation, not_implemented, ...)
messagestringrequiredHuman-readable explanation
detailsanyOptional extra context (e.g. per-field validation errors)
credit_detailCreditDetailThe estimate made at kickoff next to what has been charged so far. estimate is null for runs
started before estimates existed. Estimates and credit errors add credits_remaining and sufficient_credits.
Attributes
estimateone ofrequiredAttributes
CreditEstimate model →
minimumnumberrequiredLeast the run can cost
expectednumberLikely cost from past runs of the same config; absent without history
typicalobjectRecent p25–p75 settled range for builds of this size; absent without a dataset build estimate
Attributes
lownumberrequiredhighnumberrequiredmaximumnumberrequiredMost the run can cost
upfrontnumberCredits taken at kickoff when charged_upfront is true; 0 when the charge accrues as work completes
charged_upfrontbooleanrequiredtrue when a deposit is taken at kickoff (dataset builds, extractions); false when credits accrue as work completes
- null
credits_usednumberrequiredCredits charged so far (same value as the top-level credits_used)
credits_remainingnumberAccount balance. Only on estimates and credit errors.
sufficient_creditsbooleanWhether the balance covers estimate.maximum. Only on estimates and credit errors.
422The request is valid but can't be executed (e.g. insufficient_credits, credit_cap_exceeded when max_credits is set, validation failure)
errorobjectrequiredAttributes
typestringrequiredMachine-readable error type (bad_request, not_found, forbidden, feature_not_enabled, duplicate_run_key, insufficient_credits, credit_cap_exceeded, validation, not_implemented, ...)
messagestringrequiredHuman-readable explanation
detailsanyOptional extra context (e.g. per-field validation errors)
credit_detailCreditDetailThe estimate made at kickoff next to what has been charged so far. estimate is null for runs
started before estimates existed. Estimates and credit errors add credits_remaining and sufficient_credits.
Attributes
estimateone ofrequiredAttributes
CreditEstimate model →
minimumnumberrequiredLeast the run can cost
expectednumberLikely cost from past runs of the same config; absent without history
typicalobjectRecent p25–p75 settled range for builds of this size; absent without a dataset build estimate
Attributes
lownumberrequiredhighnumberrequiredmaximumnumberrequiredMost the run can cost
upfrontnumberCredits taken at kickoff when charged_upfront is true; 0 when the charge accrues as work completes
charged_upfrontbooleanrequiredtrue when a deposit is taken at kickoff (dataset builds, extractions); false when credits accrue as work completes
- null
credits_usednumberrequiredCredits charged so far (same value as the top-level credits_used)
credits_remainingnumberAccount balance. Only on estimates and credit errors.
sufficient_creditsbooleanWhether the balance covers estimate.maximum. Only on estimates and credit errors.