Get extraction
/extractions/{id}The extraction's status and definition. status is discovering while the agent builds the plan, then ready (or discovery_failed). Once ready, execute with POST /extractions/{id}/runs. When status is discovery_failed, error says why.
Path parameters
idstringrequiredThe extraction id (ext_...)
Responses
200Extraction status and definition
idstringExtraction id (ext_...)
namestringstatusstringerrorobjectnullableWhy discovery left no plan. Null unless status is discovery_failed.
Attributes
typestringinterrupted: the service restarted while discovery was running.stopped: someone stopped discovery.no_plan: discovery finished without a plan.plan_run_failed: discovery wrote a plan, and the plan failed when it ran.internal: an error on our side.
messagestringOne fixed sentence for the type
app_urlstring uristarting_urlstring urigoal_descriptionstringoutput_record_json_schemaobject | stringnullableThe record schema you provided
required_keysarray of stringlockedbooleanLocked plans can't be re-discovered
validation_passingbooleannullableWhether the last discovery validation passed
discovered_atstring date-timenullablerun_credits_requirednumberCredits charged per run
401Missing or invalid API key (request_status body — see the AuthError schema)
request_statusstringmessagestringerror_typestring403The API key's account may not access this resource or endpoint (forbidden), or the account has not migrated to Datasets yet (feature_not_enabled — open Datasets in the app and click "Migrate to Datasets")
errorobjectrequiredAttributes
typestringrequiredMachine-readable error type (bad_request, not_found, forbidden, feature_not_enabled, duplicate_run_key, insufficient_credits, credit_cap_exceeded, validation, not_implemented, ...)
messagestringrequiredHuman-readable explanation
detailsanyOptional extra context (e.g. per-field validation errors)
credit_detailCreditDetailThe estimate made at kickoff next to what has been charged so far. estimate is null for runs
started before estimates existed. Estimates and credit errors add credits_remaining and sufficient_credits.
Attributes
estimateone ofrequiredAttributes
CreditEstimate model →
minimumnumberrequiredLeast the run can cost
expectednumberLikely cost from past runs of the same config; absent without history
typicalobjectRecent p25–p75 settled range for builds of this size; absent without a dataset build estimate
Attributes
lownumberrequiredhighnumberrequiredmaximumnumberrequiredMost the run can cost
upfrontnumberCredits taken at kickoff when charged_upfront is true; 0 when the charge accrues as work completes
charged_upfrontbooleanrequiredtrue when a deposit is taken at kickoff (dataset builds, extractions); false when credits accrue as work completes
- null
credits_usednumberrequiredCredits charged so far (same value as the top-level credits_used)
credits_remainingnumberAccount balance. Only on estimates and credit errors.
sufficient_creditsbooleanWhether the balance covers estimate.maximum. Only on estimates and credit errors.
404No resource with that id on this account
errorobjectrequiredAttributes
typestringrequiredMachine-readable error type (bad_request, not_found, forbidden, feature_not_enabled, duplicate_run_key, insufficient_credits, credit_cap_exceeded, validation, not_implemented, ...)
messagestringrequiredHuman-readable explanation
detailsanyOptional extra context (e.g. per-field validation errors)
credit_detailCreditDetailThe estimate made at kickoff next to what has been charged so far. estimate is null for runs
started before estimates existed. Estimates and credit errors add credits_remaining and sufficient_credits.
Attributes
estimateone ofrequiredAttributes
CreditEstimate model →
minimumnumberrequiredLeast the run can cost
expectednumberLikely cost from past runs of the same config; absent without history
typicalobjectRecent p25–p75 settled range for builds of this size; absent without a dataset build estimate
Attributes
lownumberrequiredhighnumberrequiredmaximumnumberrequiredMost the run can cost
upfrontnumberCredits taken at kickoff when charged_upfront is true; 0 when the charge accrues as work completes
charged_upfrontbooleanrequiredtrue when a deposit is taken at kickoff (dataset builds, extractions); false when credits accrue as work completes
- null
credits_usednumberrequiredCredits charged so far (same value as the top-level credits_used)
credits_remainingnumberAccount balance. Only on estimates and credit errors.
sufficient_creditsbooleanWhether the balance covers estimate.maximum. Only on estimates and credit errors.