Build configured list
/configured_datasets/{id}/buildRun a configured list build — a reusable, pre-configured list template (id cds_...) set up for your account ("Configured list builds" in the app). The spec, prompt template, row cap, and per-run credit cost are all defined on the template; you only supply parameters to fill in its {{ placeholder }} values.
Returns the list-build run; poll GET /runs/{id}. The rows land in a dataset named by the run's dataset_id; fill them with POST /enrich.
Path parameters
idstringrequiredConfigured dataset id (cds_...)
Request body
parametersobjectValues for the template's placeholders (keys defined by the template)
tierstringOptional pricing/depth tier when the template defines tiers
dataset_webhook_urlstring uriURL to POST the dataset results to when the build completes
estimate_costEstimateCostParamValidate and price the request without running or charging anything; the 200 response is the credit estimate (EstimateCostResult).
max_creditsMaxCreditsParamCredit ceiling. Refused with 422 credit_cap_exceeded (nothing charged) when the estimate's maximum exceeds it.
Responses
200estimate_cost only — the tier's flat price; nothing was started
estimate_costbooleanrequiredtypestringrequiredWhat would have been charged for (monitor = one scheduled run of the monitor)
The estimate made at kickoff next to what has been charged so far. estimate is null for runs
started before estimates existed. Estimates and credit errors add credits_remaining and sufficient_credits.
Attributes
estimateone ofrequiredAttributes
CreditEstimate model →
minimumnumberrequiredLeast the run can cost
expectednumberLikely cost from past runs of the same config; absent without history
typicalobjectRecent p25–p75 settled range for builds of this size; absent without a dataset build estimate
Attributes
lownumberrequiredhighnumberrequiredmaximumnumberrequiredMost the run can cost
upfrontnumberCredits taken at kickoff when charged_upfront is true; 0 when the charge accrues as work completes
charged_upfrontbooleanrequiredtrue when a deposit is taken at kickoff (dataset builds, extractions); false when credits accrue as work completes
- null
credits_usednumberrequiredCredits charged so far (same value as the top-level credits_used)
credits_remainingnumberAccount balance. Only on estimates and credit errors.
sufficient_creditsbooleanWhether the balance covers estimate.maximum. Only on estimates and credit errors.
201Build started — the run plus dataset_id / configured_dataset_id / max_items / tier / credits_charged
idstringrequiredThe run id (run_...)
typestringrequiredWhat kind of run this is
statusstringrequiredCompletion estimate. Cell-based runs (enrichment, quick_search) also report cell counts; dataset fills report row counts; builds on a dataset report what landed.
Attributes
percent_completenumbernullableestimated_seconds_remainingnumbernullableelapsed_secondsnumbernullablecompleted_cellsintegerCell-based runs only
total_cells_expectedintegerCell-based runs only
not_found_cellsintegernullableCell-based runs only. Null while a run over 5,000 rows is in progress; set when it finishes.
total_rowsintegerDataset fills only. Rows in the fill's scope
completed_rowsintegerDataset fills only. Rows finished (ok, not found, or failed)
running_rowsintegerDataset fills only. Rows an agent is working on right now
requested_rowsintegerBuilds on a dataset only. The count asked for
generated_rowsintegerBuilds on a dataset only. Rows the generator found; set when the run finishes
added_rowsintegerBuilds on a dataset only. Rows that landed in the dataset; set when the run finishes
skipped_duplicate_rowsintegerBuilds on a dataset only. Generated rows dropped as duplicates on the index column; set when the run finishes
credits_usednumberCredits consumed so far
The estimate made at kickoff next to what has been charged so far. estimate is null for runs
started before estimates existed. Estimates and credit errors add credits_remaining and sufficient_credits.
Attributes
estimateone ofrequiredAttributes
CreditEstimate model →
minimumnumberrequiredLeast the run can cost
expectednumberLikely cost from past runs of the same config; absent without history
typicalobjectRecent p25–p75 settled range for builds of this size; absent without a dataset build estimate
Attributes
lownumberrequiredhighnumberrequiredmaximumnumberrequiredMost the run can cost
upfrontnumberCredits taken at kickoff when charged_upfront is true; 0 when the charge accrues as work completes
charged_upfrontbooleanrequiredtrue when a deposit is taken at kickoff (dataset builds, extractions); false when credits accrue as work completes
- null
credits_usednumberrequiredCredits charged so far (same value as the top-level credits_used)
credits_remainingnumberAccount balance. Only on estimates and credit errors.
sufficient_creditsbooleanWhether the balance covers estimate.maximum. Only on estimates and credit errors.
app_urlstring uriLink to view this run in the Riveter app
result_urlstring urirequiredWhere to fetch the run's output
started_atstring date-timenullablefinished_atstring date-timenullableerrorobjectnullableNull unless the run hit an error
Attributes
typestringmessagestringstopped_reasonStoppedReasonWhy the run has status stopped. Only present on stopped runs.
user_request: stopped through the API or the app. credit_limit: the account ran out of credits.
error: the run failed (internal error, or every enrichment cell failed); error.message has the detail.
enrichment_idstringPresent when the run belongs to an enrichment
enrichment_namestringdataset_idstringextraction_idstringPresent on extraction runs
monitor_idstringPresent on monitor-scheduled runs
webhook_urlstring uriPresent when the run has a webhook configured
configured_dataset_idstringmax_itemsintegertierstringnullablecredits_chargednumber400The request is malformed or names a conflicting parameter combination
errorobjectrequiredAttributes
typestringrequiredMachine-readable error type (bad_request, not_found, forbidden, feature_not_enabled, duplicate_run_key, insufficient_credits, credit_cap_exceeded, validation, not_implemented, ...)
messagestringrequiredHuman-readable explanation
detailsanyOptional extra context (e.g. per-field validation errors)
credit_detailCreditDetailThe estimate made at kickoff next to what has been charged so far. estimate is null for runs
started before estimates existed. Estimates and credit errors add credits_remaining and sufficient_credits.
Attributes
estimateone ofrequiredAttributes
CreditEstimate model →
minimumnumberrequiredLeast the run can cost
expectednumberLikely cost from past runs of the same config; absent without history
typicalobjectRecent p25–p75 settled range for builds of this size; absent without a dataset build estimate
Attributes
lownumberrequiredhighnumberrequiredmaximumnumberrequiredMost the run can cost
upfrontnumberCredits taken at kickoff when charged_upfront is true; 0 when the charge accrues as work completes
charged_upfrontbooleanrequiredtrue when a deposit is taken at kickoff (dataset builds, extractions); false when credits accrue as work completes
- null
credits_usednumberrequiredCredits charged so far (same value as the top-level credits_used)
credits_remainingnumberAccount balance. Only on estimates and credit errors.
sufficient_creditsbooleanWhether the balance covers estimate.maximum. Only on estimates and credit errors.
401Missing or invalid API key (request_status body — see the AuthError schema)
request_statusstringmessagestringerror_typestring403The API key's account may not access this resource or endpoint (forbidden), or the account has not migrated to Datasets yet (feature_not_enabled — open Datasets in the app and click "Migrate to Datasets")
errorobjectrequiredAttributes
typestringrequiredMachine-readable error type (bad_request, not_found, forbidden, feature_not_enabled, duplicate_run_key, insufficient_credits, credit_cap_exceeded, validation, not_implemented, ...)
messagestringrequiredHuman-readable explanation
detailsanyOptional extra context (e.g. per-field validation errors)
credit_detailCreditDetailThe estimate made at kickoff next to what has been charged so far. estimate is null for runs
started before estimates existed. Estimates and credit errors add credits_remaining and sufficient_credits.
Attributes
estimateone ofrequiredAttributes
CreditEstimate model →
minimumnumberrequiredLeast the run can cost
expectednumberLikely cost from past runs of the same config; absent without history
typicalobjectRecent p25–p75 settled range for builds of this size; absent without a dataset build estimate
Attributes
lownumberrequiredhighnumberrequiredmaximumnumberrequiredMost the run can cost
upfrontnumberCredits taken at kickoff when charged_upfront is true; 0 when the charge accrues as work completes
charged_upfrontbooleanrequiredtrue when a deposit is taken at kickoff (dataset builds, extractions); false when credits accrue as work completes
- null
credits_usednumberrequiredCredits charged so far (same value as the top-level credits_used)
credits_remainingnumberAccount balance. Only on estimates and credit errors.
sufficient_creditsbooleanWhether the balance covers estimate.maximum. Only on estimates and credit errors.
404No resource with that id on this account
errorobjectrequiredAttributes
typestringrequiredMachine-readable error type (bad_request, not_found, forbidden, feature_not_enabled, duplicate_run_key, insufficient_credits, credit_cap_exceeded, validation, not_implemented, ...)
messagestringrequiredHuman-readable explanation
detailsanyOptional extra context (e.g. per-field validation errors)
credit_detailCreditDetailThe estimate made at kickoff next to what has been charged so far. estimate is null for runs
started before estimates existed. Estimates and credit errors add credits_remaining and sufficient_credits.
Attributes
estimateone ofrequiredAttributes
CreditEstimate model →
minimumnumberrequiredLeast the run can cost
expectednumberLikely cost from past runs of the same config; absent without history
typicalobjectRecent p25–p75 settled range for builds of this size; absent without a dataset build estimate
Attributes
lownumberrequiredhighnumberrequiredmaximumnumberrequiredMost the run can cost
upfrontnumberCredits taken at kickoff when charged_upfront is true; 0 when the charge accrues as work completes
charged_upfrontbooleanrequiredtrue when a deposit is taken at kickoff (dataset builds, extractions); false when credits accrue as work completes
- null
credits_usednumberrequiredCredits charged so far (same value as the top-level credits_used)
credits_remainingnumberAccount balance. Only on estimates and credit errors.
sufficient_creditsbooleanWhether the balance covers estimate.maximum. Only on estimates and credit errors.
422The request is valid but can't be executed (e.g. insufficient_credits, credit_cap_exceeded when max_credits is set, validation failure)
errorobjectrequiredAttributes
typestringrequiredMachine-readable error type (bad_request, not_found, forbidden, feature_not_enabled, duplicate_run_key, insufficient_credits, credit_cap_exceeded, validation, not_implemented, ...)
messagestringrequiredHuman-readable explanation
detailsanyOptional extra context (e.g. per-field validation errors)
credit_detailCreditDetailThe estimate made at kickoff next to what has been charged so far. estimate is null for runs
started before estimates existed. Estimates and credit errors add credits_remaining and sufficient_credits.
Attributes
estimateone ofrequiredAttributes
CreditEstimate model →
minimumnumberrequiredLeast the run can cost
expectednumberLikely cost from past runs of the same config; absent without history
typicalobjectRecent p25–p75 settled range for builds of this size; absent without a dataset build estimate
Attributes
lownumberrequiredhighnumberrequiredmaximumnumberrequiredMost the run can cost
upfrontnumberCredits taken at kickoff when charged_upfront is true; 0 when the charge accrues as work completes
charged_upfrontbooleanrequiredtrue when a deposit is taken at kickoff (dataset builds, extractions); false when credits accrue as work completes
- null
credits_usednumberrequiredCredits charged so far (same value as the top-level credits_used)
credits_remainingnumberAccount balance. Only on estimates and credit errors.
sufficient_creditsbooleanWhether the balance covers estimate.maximum. Only on estimates and credit errors.