EstimateCostResult
Returned with 200 when a paid endpoint is called with estimate_cost: true. The request was validated
and priced; nothing was created or charged.
Attributes
estimate_costbooleanrequiredtypestringrequiredWhat would have been charged for (monitor = one scheduled run of the monitor)
The estimate made at kickoff next to what has been charged so far. estimate is null for runs
started before estimates existed. Estimates and credit errors add credits_remaining and sufficient_credits.
Attributes
estimateone ofrequiredAttributes
CreditEstimate model →
minimumnumberrequiredLeast the run can cost
expectednumberLikely cost from past runs of the same config; absent without history
typicalobjectRecent p25–p75 settled range for builds of this size; absent without a dataset build estimate
Attributes
lownumberrequiredhighnumberrequiredmaximumnumberrequiredMost the run can cost
upfrontnumberCredits taken at kickoff when charged_upfront is true; 0 when the charge accrues as work completes
charged_upfrontbooleanrequiredtrue when a deposit is taken at kickoff (dataset builds, extractions); false when credits accrue as work completes
- null
credits_usednumberrequiredCredits charged so far (same value as the top-level credits_used)
credits_remainingnumberAccount balance. Only on estimates and credit errors.
sufficient_creditsbooleanWhether the balance covers estimate.maximum. Only on estimates and credit errors.